Hi All,
In order to upgrade my Zentyal V5.0, I have added a *temporary* ADC, and copied all shares to the ADC from the PDC.
Now I have shutdown the PDC - and users are able to login to the ADC, and drive maps are working.
1. Once I am done installing a fresh Zentyal PDC V7.0 - Do I then add it as a an ADC again to the current domain or do I add it as a PDC?
2. Since I have shutdown the PDC, can I now make the ADC into the PDC?
3. Then I can add the new Zentyal as a ADC, then shutdown the previous PDC and make it into PDC?
Hope you get me! Please help!
Thank you!