Author Topic: Exchange 2K7 single server/single domain - is phased migration possible  (Read 1361 times)

rtkluttz

  • Zen Apprentice
  • *
  • Posts: 2
  • Karma: +0/-0
    • View Profile
I am looking at moving from Exchange 2007 over to Zentyal but I need to do a phased migration of only a couple users at a time. Is this possible considering that I only have a single domain and single server?

We do not plan on using any features of Zentyal other than mail, mail antivirus, DNS blackholing and gateway scanning. All mail related. Do not HAVE to have a direct tie to my active directory.

I currently have a barracuda mail gateway in front of my exchange that I can keep or ditch, either way.